recommended reading

First Instrument Deemed Ready for NOAA’s Next-Gen Polar Orbiting Satellite

The Joint Polar Satellite System (JPSS) will launch the first of two planned satellites in 2017.

The Joint Polar Satellite System (JPSS) will launch the first of two planned satellites in 2017. // NASA

The first of five advanced instruments to be installed aboard the country’s next-generation polar orbiting environmental satellite successfully completed a key review in late April.

The instrument, known as the Clouds and the Earth’s Radiant Energy System (CERES), was developed by Northrop Grumman and will help scientists understand the Earth’s energy balance. Its timely completion bodes well for the National Oceanic and Atmospheric Administration’s $11 billion Joint Polar Satellite System (JPSS), which will launch the first of two planned satellites in 2017.

“CERES is the first JPSS-1 instrument to reach this important milestone, and the others are not far behind,” said Mary Kicza, assistant administrator for NOAA’s Satellite and Information Service. “We’re on track to have JPSS-1 ready to launch in 2017, adding to a robust satellite fleet that provides vital environmental intelligence for the nation and the world.”

Both the NOAA inspector general and the Government Accountability Office have kept a close eye on NOAA’s JPSS program over the past 18 months, in large part because the agency faces a potential gap in polar orbiting satellite coverage. NOAA currently relies heavily on a converted demonstration satellite launched by the JPSS team in 2011 to gather the lion’s share of real-time data like the direction, speed and intensity of storms, all of which feed into NOAA’s forecast models that track storms affecting the whole country.

Yet that satellite has a short life expectancy, and GAO officials have predicted a gap in coverage of anywhere from 17 to 54 months, the likes of which would dramatically affect the accuracy of storm forecasts, such as the one that predicted Hurricane Sandy’s westward landfall in late 2012.

CERES is one of five instruments that will fly aboard JPSS-1. The others are:

  • The Advanced Technology Microwave Sounder (ATMS) and Cross-track Infrared Sounder (CrIS) will work closely together to provide atmospheric and temperature profiles for weather forecasting
  • The Visible Infrared Imaging Radiometer Suite (VIIRS), which will create high-resolution imagery of the atmosphere using visible and infrared channels 
  • The OMPS, or the Ozone Mapping and Profiler Suite, which will measure ozone concentration in the atmosphere and provide significant input to the numerical forecast models

Meanwhile, NOAA’s other major satellite acquisition, the $11 billion Geostationary Operational Environmental Satellite (GOES-R), is on pace to launch by early 2016. Geostationary satellites orbit higher above the earth’s surface than polar-orbiting satellites do, and the data they produce are geared toward long-term weather forecasting.

Combined, both next-generation satellite programs will produce a gargantuan amount of weather data for scientists, weather forecasters and researchers to sift through -- up to 20 terabytes per day. 

Threatwatch Alert

Thousands of cyber attacks occur each day

See the latest threats

JOIN THE DISCUSSION

Close [ x ] More from Nextgov
 
 

Thank you for subscribing to newsletters from Nextgov.com.
We think these reports might interest you:

  • It’s Time for the Federal Government to Embrace Wireless and Mobility

    The United States has turned a corner on the adoption of mobile phones, tablets and other smart devices, outpacing traditional desktop and laptop sales by a wide margin. This issue brief discusses the state of wireless and mobility in federal government and outlines why now is the time to embrace these technologies in government.

    Download
  • Featured Content from RSA Conference: Dissed by NIST

    Learn more about the latest draft of the U.S. National Institute of Standards and Technology guidance document on authentication and lifecycle management.

    Download
  • A New Security Architecture for Federal Networks

    Federal government networks are under constant attack, and the number of those attacks is increasing. This issue brief discusses today's threats and a new model for the future.

    Download
  • Going Agile:Revolutionizing Federal Digital Services Delivery

    Here’s one indication that times have changed: Harriet Tubman is going to be the next face of the twenty dollar bill. Another sign of change? The way in which the federal government arrived at that decision.

    Download
  • Software-Defined Networking

    So many demands are being placed on federal information technology networks, which must handle vast amounts of data, accommodate voice and video, and cope with a multitude of highly connected devices while keeping government information secure from cyber threats. This issue brief discusses the state of SDN in the federal government and the path forward.

    Download
  • The New IP: Moving Government Agencies Toward the Network of The Future

    Federal IT managers are looking to modernize legacy network infrastructures that are taxed by growing demands from mobile devices, video, vast amounts of data, and more. This issue brief discusses the federal government network landscape, as well as market, financial force drivers for network modernization.

    Download

When you download a report, your information may be shared with the underwriters of that document.