recommended reading

Navy Deploys First High-Tech Surveillance Aircraft to Okinawa

Two Boeing-built P-8A Poseidons have arrived at Kadena Air Force Base in Okinawa, Japan.

Two Boeing-built P-8A Poseidons have arrived at Kadena Air Force Base in Okinawa, Japan. // United States Navy

Two Boeing-built P-8A Poseidons -- among the Navy’s newest surveillance aircraft -- have arrived at Kadena Air Force Base in Okinawa, Japan, Navy spokeswoman Lt. Cmdr. Katharine Cerezo said.

Okinawa is 260 miles east of the new Air Defense Identification Zone, which was established by China on Nov. 23 around the disputed Senkaku Islands claimed by both Japan and China.  The P-8 has a range of 1,200 miles.

Due to time differences, Navy representatives in Japan were unavailable for comment on whether or not the P-8s will patrol in the China air defense zone. The aircraft arrived in Japan on Sunday.

The P-8s, built on a Boeing 737 commercial airframe, achieved initial operational capability on Friday, Cerezo said, with two aircraft from Patrol Squadron 16, based at the Jacksonville, Fla., Naval Air Station deployed to Okinawa on the same day.

The Navy plans to buy 122 P-8s at a total cost of $33.6 billion to replace its aging fleet of turbo-prop powered Lockheed Martin P-3s, the first of which entered service in 1961.

The P-8s have a crew of nine, including five systems operators and observers who manage and use onboard systems such as the AN/PY-10 multimission radar from Raytheon, which can eyeball targets at long range with high fidelity. These crew members also operate a hydro-carbon sensor to detect ships and diesel-powered submarines. The P-8 features a secure, wideband satellite communications system and carries a mix of weapons, including torpedoes, anti-ship missiles and depth charges.

Boeing started production on the P8 in August 2010, and last Friday, Capt. Scott Dillon, program manager for Maritime Patrol and Reconnaissance Aircraft Program Office, said the declaration of Initial Operational Capability “means the Navy can effectively deploy the P-8A for operational missions and continue to successfully transition from the aging P-3C." The Poseidon program is on track to complete the remaining preparations for the first operational deployment of a P-8A squadron. To date, 12 low rate initial production aircraft have been delivered to the fleet.

Threatwatch Alert

Thousands of cyber attacks occur each day

See the latest threats

JOIN THE DISCUSSION

Close [ x ] More from Nextgov
 
 

Thank you for subscribing to newsletters from Nextgov.com.
We think these reports might interest you:

  • It’s Time for the Federal Government to Embrace Wireless and Mobility

    The United States has turned a corner on the adoption of mobile phones, tablets and other smart devices, outpacing traditional desktop and laptop sales by a wide margin. This issue brief discusses the state of wireless and mobility in federal government and outlines why now is the time to embrace these technologies in government.

    Download
  • Featured Content from RSA Conference: Dissed by NIST

    Learn more about the latest draft of the U.S. National Institute of Standards and Technology guidance document on authentication and lifecycle management.

    Download
  • A New Security Architecture for Federal Networks

    Federal government networks are under constant attack, and the number of those attacks is increasing. This issue brief discusses today's threats and a new model for the future.

    Download
  • Going Agile:Revolutionizing Federal Digital Services Delivery

    Here’s one indication that times have changed: Harriet Tubman is going to be the next face of the twenty dollar bill. Another sign of change? The way in which the federal government arrived at that decision.

    Download
  • Software-Defined Networking

    So many demands are being placed on federal information technology networks, which must handle vast amounts of data, accommodate voice and video, and cope with a multitude of highly connected devices while keeping government information secure from cyber threats. This issue brief discusses the state of SDN in the federal government and the path forward.

    Download
  • The New IP: Moving Government Agencies Toward the Network of The Future

    Federal IT managers are looking to modernize legacy network infrastructures that are taxed by growing demands from mobile devices, video, vast amounts of data, and more. This issue brief discusses the federal government network landscape, as well as market, financial force drivers for network modernization.

    Download

When you download a report, your information may be shared with the underwriters of that document.