recommended reading

NOAA Moves a Step Closer to More Accurate Weather Forecasts

NOAA

The $11 billion successor to the National Oceanic and Atmospheric Administration’s current crop of geostationary weather satellites received another key delivery last week with word that five of six instruments are ready to be integrated into the next-generation spacecraft.

When the Geostationary Operational Environmental Satellite - R series reaches full capacity, it will help provide more accurate weather forecasts, improve hurricane tracking and enhance flight-route planning.

The magnetometer -- which will monitor magnetic field variations around Earth and help forecasters predict the consequences of geomagnetic storms -- is the fifth main instrument developed to fly aboard the first GOES-R, scheduled to launch in early 2016.

Physically, the magnetometer is the largest of the instruments developed for the GOES-R, with a boom that will extend 26 feet from the spacecraft once in space. The sensors and electronic elements were developed by Macintyre Electronic Design Associates in Sterling, Virginia, and the boom was built by ATK in Goleta, California.

"This milestone is another example of our continuing progress to develop, build and launch GOES-R," said Greg Mandt, NOAA system program director for the GOES-R Series Program.

Both the Government Accountability Office and NOAA’s inspector general criticized the next-generation weather satellite program after NOAA delayed the launch date in 2013. However, the program appears in good stead now. One final instrument, the geostationary lightning mapper, is still to be completed. That instrument will continuously monitor lightning activity over the western hemisphere.

Other completed instruments ready for GOES-R integration include the advanced baseline imager, solar ultraviolet imager, extreme ultraviolet and X-ray irradiance sensors, and the space environment in-situ suite.

Threatwatch Alert

Thousands of cyber attacks occur each day

See the latest threats

JOIN THE DISCUSSION

Close [ x ] More from Nextgov
 
 

Thank you for subscribing to newsletters from Nextgov.com.
We think these reports might interest you:

  • Featured Content from RSA Conference: Dissed by NIST

    Learn more about the latest draft of the U.S. National Institute of Standards and Technology guidance document on authentication and lifecycle management.

    Download
  • PIV- I And Multifactor Authentication: The Best Defense for Federal Government Contractors

    This white paper explores NIST SP 800-171 and why compliance is critical to federal government contractors, especially those that work with the Department of Defense, as well as how leveraging PIV-I credentialing with multifactor authentication can be used as a defense against cyberattacks

    Download
  • Toward A More Innovative Government

    This research study aims to understand how state and local leaders regard their agency’s innovation efforts and what they are doing to overcome the challenges they face in successfully implementing these efforts.

    Download
  • From Volume to Value: UK’s NHS Digital Provides U.S. Healthcare Agencies A Roadmap For Value-Based Payment Models

    The U.S. healthcare industry is rapidly moving away from traditional fee-for-service models and towards value-based purchasing that reimburses physicians for quality of care in place of frequency of care.

    Download
  • GBC Flash Poll: Is Your Agency Safe?

    Federal leaders weigh in on the state of information security

    Download
  • Data-Centric Security vs. Database-Level Security

    Database-level encryption had its origins in the 1990s and early 2000s in response to very basic risks which largely revolved around the theft of servers, backup tapes and other physical-layer assets. As noted in Verizon’s 2014, Data Breach Investigations Report (DBIR)1, threats today are far more advanced and dangerous.

    Download

When you download a report, your information may be shared with the underwriters of that document.